Matboard Bridge Design

How can a bridge carry a 400 N moving train load using one sheet of matboard and a limited supply of contact cement?

Team 404’s completed matboard bridge, held by the team and decorated with handwritten engineering equations.
Team 404’s completed bridge, built from matboard and contact cement.
StatuscompletedDatesOctober–November 2025RoleDesign contributor · report author · primary builderAffiliationCIV102 · Team 404 · University of Toronto
1

Context & question

How can a bridge carry a 400 N moving train load using one sheet of matboard and a limited supply of contact cement?

Designed and built a reinforced matboard box-girder bridge with Team 404 for CIV102. I helped formulate the equations and failure checks for the MATLAB simulation, ideated the cross-section, wrote the full design report, and led fabrication of the physical bridge.

The material allowance was one 813 × 1016 × 1.27 mm sheet of matboard and two 35 mL tubes of contact cement. The bridge needed to accommodate a moving train load of 400 N, so cross-section efficiency, splice placement, diaphragm support, and careful use of glue were central design decisions.

The team’s MATLAB model used beam theory to evaluate the moving load, section properties, deflection, and factors of safety against flexural tension and compression, matboard and glue shear, and flange and web buckling. Interchangeable cross-section files made it possible to compare successive designs. The linked team repository also contains a Python analysis implementation.

Starting from Design 0, we reduced the spacing between webs, doubled the top-flange thickness, and explored an additional web. The final iteration combined paired webs, a lower section height, and revised flange dimensions. Top and bottom flange splices were staggered, while diaphragms provided support against web instability.

The design report records an increase in predicted failure load from 256 N for the baseline to approximately 487 N for the final MATLAB iteration, with the minimum factor of safety increasing from 0.64 to 1.216. Flexural compression governed the final prediction. These are the report’s Load Case 1 simulation benchmarks.

I was the primary builder of the physical bridge: sketching the pieces onto the matboard sheet, cutting and folding them, and attaching the components while working within the limited contact-cement allowance. The fabrication photographs show the layout and assembly stages alongside the completed bridge.

Design train load
400 N
moving load · Load Case 1
Baseline prediction
256 N
Design 0 · predicted failure
Final prediction
≈487 N
Design 4 · predicted failure
Minimum simulated FOS
1.216
governed by flexural compression
2

My contribution

  • Helped set up the relevant structural equations and failure modes for the team’s MATLAB simulation.
  • Ideated the bridge cross-section and contributed to the design iterations under the material and glue constraints.
  • Wrote the full team design report, documenting the design decisions, iteration history, and simulation results.
  • Served as the primary builder of the physical bridge, sketching the component outlines directly onto the matboard sheet.
  • Cut, folded, fitted, and attached the bridge components using the limited supply of contact cement.
3

Outcome

Completed the physical bridge and the full design report, connecting cross-section iteration and failure-mode analysis with hands-on fabrication. The final report’s MATLAB model exceeded the 400 N design load in prediction: approximately 487 N predicted failure load and a minimum factor of safety of 1.216, compared with 256 N and 0.64 for the baseline design.

4

Excerpts

The cross-section and MATLAB model come from the design report; the layout and assembly photographs come from the engineering-drawings record. Select any figure to enlarge it. The full documents and team code are linked below.

Final cross-section concept

Final-iteration cross-section sketch from the design report, showing the paired webs and reinforced flange arrangement selected for fabrication.

Annotated final cross-section sketch showing a reinforced top flange, paired webs, and revised bottom flange dimensions.
Final MATLAB structural model

Final-iteration MATLAB visualisation from the design report. The historical minimum factor of safety is 1.216, with flexural compression as the governing mode.

MATLAB bridge structural model with historical factors of safety, including a minimum of 1.216 governed by flexural compression.
Laying out the matboard sheet

Component outlines marked directly onto the limited matboard sheet before cutting and folding. Photograph from the engineering-drawings and fabrication record.

A matboard sheet with the bridge components sketched out before cutting.
Physical bridge assembly

Assembly of the box-girder bridge, with diaphragms, folded components, clamps, and contact cement. Photograph from the team’s fabrication record.

The matboard bridge being assembled on a table with clamps, cut diaphragms, tools, and glue.
5

Documentation & code

Explore the complete team design report, engineering drawings and fabrication record, calculation package, and MATLAB/Python source repository.